Arizona Public Service Queue Project Q475 — Solar+Battery in Maricopa, the U.S.

Arizona Public Service Queue Project Q475 — Solar+Battery in Maricopa, the U.S. is a 250.0 MW solar+battery interconnection project with a current status of active. It is proposed to connect at 69kV.

250.0 MWCapacity
ActiveStatus
Market
Solar+BatteryTechnology

Project facts

Canonical nameArizona Public Service Queue Project Q475 — Solar+Battery in Maricopa, the U.S.
Queue IDQ475
Statusactive
Source status(Executed) Interconnection Cluster: Energy
Market
TechnologySolar+Battery
Capacity250.0 MW
State
CountyMaricopa
Point of interconnection69kV
Requested (queue) date2022-03-31
Proposed in-service date2025-12-31
Operational date
Withdrawn date
Developer
Utility / transmission ownerArizona Public Service

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-10poi_nameGen Tie) Perryville 69kV69kVlow
2026-08-10phaseCluster Study (Phaselow
2026-08-03new_projectactivehigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27

Provenance: aps-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata