Arizona Public Service Queue Project Q488 — Solar+Battery in Az, the U.S.

Arizona Public Service Queue Project Q488 — Solar+Battery in Az, the U.S. is a 600.0 MW solar+battery interconnection project with a current status of active. It is proposed to connect at SUBSTATION 230kV.

600.0 MWCapacity
ActiveStatus
—Market
Solar+BatteryTechnology

Project facts

Canonical nameArizona Public Service Queue Project Q488 — Solar+Battery in Az, the U.S.
Queue IDQ488
Statusactive
Source statusLGIA (Draft) Interconnection Service Network Transitional Cluster: Resource
Market—
TechnologySolar+Battery
Capacity600.0 MW
State—
CountyAz
Point of interconnectionSUBSTATION 230kV
Requested (queue) date2022-09-30
Proposed in-service date2026-06-01
Operational date—
Withdrawn date—
Developer—
Utility / transmission ownerArizona Public Service

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-09-21poi_name230kVSUBSTATION 230kVlow
2026-09-21phase—Generationlow
2026-08-10poi_nameSUBSTATION 230kV230kVlow
2026-08-03new_project—activehigh

Explore related data

Source last checked2026-10-12
Data last materially changed2026-10-12
Page data generated2026-10-12

Provenance: aps-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata