Arizona Public Service Queue Project Q528 — Solar+Battery in Az, the U.S.

Arizona Public Service Queue Project Q528 — Solar+Battery in Az, the U.S. is a 500.0 MW solar+battery interconnection project with a current status of active. It is proposed to connect at - Cholla 345 kV Line POI off the Milligan to.

500.0 MWCapacity
ActiveStatus
—Market
Solar+BatteryTechnology

Project facts

Canonical nameArizona Public Service Queue Project Q528 — Solar+Battery in Az, the U.S.
Queue IDQ528
Statusactive
Source statusInterconnection Phase 4 Facilities Study Service Interconnection Current Status Request Energy Transitional Cluster:
Market—
TechnologySolar+Battery
Capacity500.0 MW
State—
CountyAz
Point of interconnection- Cholla 345 kV Line POI off the Milligan to
Requested (queue) date2023-03-30
Proposed in-service date2027-06-01
Operational date—
Withdrawn date—
Developer—
Utility / transmission ownerArizona Public Service

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-09-21poi_name- Sunshine- Cholla 345 kV Line POI off the Milligan tolow
2026-09-21phase—Generationlow
2026-08-10poi_name345 kV Line Twin Arrows - Sunshine- Sunshinelow
2026-08-10phaseStudy—low
2026-08-03new_project—activehigh

Explore related data

Source last checked2026-11-23
Data last materially changed2026-10-12
Page data generated2026-11-26

Provenance: aps-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.