Arizona Public Service Queue Project Q549 — Gas in Maricopa Az, the U.S.

Arizona Public Service Queue Project Q549 — Gas in Maricopa Az, the U.S. is a 42.1 MW gas interconnection project with a current status of active. It is proposed to connect at Substation 500kV.

42.1 MWCapacity
ActiveStatus
Market
GasTechnology

Project facts

Canonical nameArizona Public Service Queue Project Q549 — Gas in Maricopa Az, the U.S.
Queue IDQ549
Statusactive
Source statusRe-Study Interconnection Network
Market
TechnologyGas
Capacity42.1 MW
State
CountyMaricopa Az
Point of interconnectionSubstation 500kV
Requested (queue) date2024-04-12
Proposed in-service date2026-06-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerArizona Public Service

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-10poi_nameAvery Substation Redhawk 500kVSubstation 500kVlow
2026-08-03new_projectactivehigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27

Provenance: aps-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata