Arizona Public Service Queue Project Q584 — Battery in Pinal Az, the U.S.

Arizona Public Service Queue Project Q584 — Battery in Pinal Az, the U.S. is a 350.0 MW battery interconnection project with a current status of active. It is proposed to connect at Bianco Substation Valley 230kV.

350.0 MWCapacity
ActiveStatus
Market
BatteryTechnology

Project facts

Canonical nameArizona Public Service Queue Project Q584 — Battery in Pinal Az, the U.S.
Queue IDQ584
Statusactive
Source status1 Cluster Study Interconnection Network
Market
TechnologyBattery
Capacity350.0 MW
State
CountyPinal Az
Point of interconnectionBianco Substation Valley 230kV
Requested (queue) date2025-05-07
Proposed in-service date2029-06-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerArizona Public Service

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-10poi_nameSubstation Freedom Valley 230kVBianco Substation Valley 230kVlow
2026-08-03new_projectactivehigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-28

Provenance: aps-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata