Arizona Public Service Queue Project Q586 — Battery in Maricopa Az, the U.S.

Arizona Public Service Queue Project Q586 — Battery in Maricopa Az, the U.S. is a 300.0 MW battery interconnection project with a current status of active. It is proposed to connect at 230kV.

300.0 MWCapacity
ActiveStatus
Market
BatteryTechnology

Project facts

Canonical nameArizona Public Service Queue Project Q586 — Battery in Maricopa Az, the U.S.
Queue IDQ586
Statusactive
Source status2 Cluster Study Interconnection Energy
Market
TechnologyBattery
Capacity300.0 MW
State
CountyMaricopa Az
Point of interconnection230kV
Requested (queue) date2025-05-07
Proposed in-service date2030-06-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerArizona Public Service

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-10poi_nameWestwing 230kV230kVlow
2026-08-10phaseStudylow
2026-08-03new_projectactivehigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27

Provenance: aps-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.