Arizona Public Service Queue Project Q589 — Battery in Az, the U.S.

Arizona Public Service Queue Project Q589 — Battery in Az, the U.S. is a 400.0 MW battery interconnection project with a current status of active. It is proposed to connect at Bianco 230 kV substation.

400.0 MWCapacity
ActiveStatus
—Market
BatteryTechnology

Project facts

Canonical nameArizona Public Service Queue Project Q589 — Battery in Az, the U.S.
Queue IDQ589
Statusactive
Source statusPhase 1 Cluster Study Interconnection Service Network Phase 2 Cluster Study Resource
Market—
TechnologyBattery
Capacity400.0 MW
State—
CountyAz
Point of interconnectionBianco 230 kV substation
Requested (queue) date2025-05-08
Proposed in-service date2030-03-06
Operational date—
Withdrawn date—
Developer—
Utility / transmission ownerArizona Public Service

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-09-21poi_name—Bianco 230 kV substationlow
2026-09-21phase—Generationlow
2026-08-10poi_namesubstation Honeywell 69kV—low
2026-08-03new_project—activehigh

Explore related data

Source last checked2026-11-23
Data last materially changed2026-10-12
Page data generated2026-11-26

Provenance: aps-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.