Arizona Public Service Queue Project Q604 — Solar+Battery in Pinal Az, the U.S.

Arizona Public Service Queue Project Q604 — Solar+Battery in Pinal Az, the U.S. is a 200.0 MW solar+battery interconnection project with a current status of active. It is proposed to connect at Rosa - Tat Momoli line.

200.0 MWCapacity
ActiveStatus
Market
Solar+BatteryTechnology

Project facts

Canonical nameArizona Public Service Queue Project Q604 — Solar+Battery in Pinal Az, the U.S.
Queue IDQ604
Statusactive
Source status1 Cluster Study Interconnection Start of Network
Market
TechnologySolar+Battery
Capacity200.0 MW
State
CountyPinal Az
Point of interconnectionRosa - Tat Momoli line
Requested (queue) date2025-05-15
Proposed in-service date2030-10-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerArizona Public Service

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-10poi_nameSanta Rosa - Tat Momoli 230kV lineRosa - Tat Momoli linelow
2026-08-03new_projectactivehigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27

Provenance: aps-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata