Arizona Public Service Queue Project Q607 — Battery in Maricopa Az, the U.S.

Arizona Public Service Queue Project Q607 — Battery in Maricopa Az, the U.S. is a 300.0 MW battery interconnection project with a current status of active. It is proposed to connect at 230kV LGP POI In Service.

300.0 MWCapacity
ActiveStatus
Market
BatteryTechnology

Project facts

Canonical nameArizona Public Service Queue Project Q607 — Battery in Maricopa Az, the U.S.
Queue IDQ607
Statusactive
Source status2 Cluster Study Interconnection Interconnection Status Type Network
Market
TechnologyBattery
Capacity300.0 MW
State
CountyMaricopa Az
Point of interconnection230kV LGP POI In Service
Requested (queue) date2025-05-15
Proposed in-service date2029-12-31
Operational date
Withdrawn date
Developer
Utility / transmission ownerArizona Public Service

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-10poi_nameTrilby Wash 230kV Requested POI 8.6 miles from Milligan along the future Milligan -230kV LGP POI In Servicelow
2026-08-10phaseStudylow
2026-08-03new_projectactivehigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27

Provenance: aps-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata