Arizona Public Service Queue Project Q609 — Solar in Navajo Az, the U.S.

Arizona Public Service Queue Project Q609 — Solar in Navajo Az, the U.S. is a 500.0 MW solar interconnection project with a current status of active. It is proposed to connect at of the Power Generation onto the "GoSolar - Cholla" site at posts 149/4 for the new on parcel 104-02- Corner.

500.0 MWCapacity
ActiveStatus
Market
SolarTechnology

Project facts

Canonical nameArizona Public Service Queue Project Q609 — Solar in Navajo Az, the U.S.
Queue IDQ609
Statusactive
Source statusStudy Phase 2 Interconnection Start of Energy
Market
TechnologySolar
Capacity500.0 MW
State
CountyNavajo Az
Point of interconnectionof the Power Generation onto the "GoSolar - Cholla" site at posts 149/4 for the new on parcel 104-02- Corner
Requested (queue) date2025-05-16
Proposed in-service date2026-12-31
Operational date
Withdrawn date
Developer
Utility / transmission ownerArizona Public Service

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-10poi_namefeet North-East of the Cholla Power Generation Facility onto the "GoSolar Sun Mesa - Cholla" project site at posts 149/4 and 150/3 for the new gen-tie on parcel 104-02-024B APS Four Cornerof the Power Generation onto the "GoSolar - Cholla" site at posts 149/4 for the new on parcel 104-02- Cornerlow
2026-08-10phaseStudylow
2026-08-03new_projectactivehigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27

Provenance: aps-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.