Arizona Public Service Queue Project Q612 — Battery in Coconino Az, the U.S.

Arizona Public Service Queue Project Q612 — Battery in Coconino Az, the U.S. is a 161.0 MW battery interconnection project with a current status of active. It is proposed to connect at Collector.

161.0 MWCapacity
ActiveStatus
Market
BatteryTechnology

Project facts

Canonical nameArizona Public Service Queue Project Q612 — Battery in Coconino Az, the U.S.
Queue IDQ612
Statusactive
Source statusUpdated Deposit Interconnection Network
Market
TechnologyBattery
Capacity161.0 MW
State
CountyCoconino Az
Point of interconnectionCollector
Requested (queue) date2025-05-21
Proposed in-service date2028-12-31
Operational date
Withdrawn date
Developer
Utility / transmission ownerArizona Public Service

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-10poi_nameFarm Q196 34.5KV Collector SystemCollectorlow
2026-08-03new_projectactivehigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27

Provenance: aps-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.