Arizona Public Service Queue Project Q619 — Solar+Battery in Pinal Az, the U.S.

Arizona Public Service Queue Project Q619 — Solar+Battery in Pinal Az, the U.S. is a 100.0 MW solar+battery interconnection project with a current status of active. It is proposed to connect at Line.

100.0 MWCapacity
ActiveStatus
Market
Solar+BatteryTechnology

Project facts

Canonical nameArizona Public Service Queue Project Q619 — Solar+Battery in Pinal Az, the U.S.
Queue IDQ619
Statusactive
Source status1 Cluster Study Interconnection Network
Market
TechnologySolar+Battery
Capacity100.0 MW
State
CountyPinal Az
Point of interconnectionLine
Requested (queue) date2026-04-06
Proposed in-service date2028-12-31
Operational date
Withdrawn date
Developer
Utility / transmission ownerArizona Public Service

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-10poi_name115kv Line Shared POI with Q621Linelow
2026-08-03new_projectactivehigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27

Provenance: aps-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata