Arizona Public Service Queue Project Q620 — Solar+Battery in Yuma Az, the U.S.

Arizona Public Service Queue Project Q620 — Solar+Battery in Yuma Az, the U.S. is a 500.0 MW solar+battery interconnection project with a current status of active. It is proposed to connect at 500kV Cut-In.

500.0 MWCapacity
ActiveStatus
Market
Solar+BatteryTechnology

Project facts

Canonical nameArizona Public Service Queue Project Q620 — Solar+Battery in Yuma Az, the U.S.
Queue IDQ620
Statusactive
Source status1 Cluster Study Interconnection Network
Market
TechnologySolar+Battery
Capacity500.0 MW
State
CountyYuma Az
Point of interconnection500kV Cut-In
Requested (queue) date2026-04-23
Proposed in-service date2031-12-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerArizona Public Service

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-10poi_nameProject Shared POI with Q620500kV Cut-Inlow
2026-08-03new_projectactivehigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27

Provenance: aps-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata