Arizona Public Service Queue Project Q622 — Solar in Coconino Az, the U.S.

Arizona Public Service Queue Project Q622 — Solar in Coconino Az, the U.S. is a 1,000.0 MW solar interconnection project with a current status of active. It is proposed to connect at LGP POI In Service - Moenkopi.

1,000.0 MWCapacity
ActiveStatus
Market
SolarTechnology

Project facts

Canonical nameArizona Public Service Queue Project Q622 — Solar in Coconino Az, the U.S.
Queue IDQ622
Statusactive
Source status1 Cluster Study Interconnection Interconnection Status Type Network
Market
TechnologySolar
Capacity1,000.0 MW
State
CountyCoconino Az
Point of interconnectionLGP POI In Service - Moenkopi
Requested (queue) date2026-04-23
Proposed in-service date2031-12-31
Operational date
Withdrawn date
Developer
Utility / transmission ownerArizona Public Service

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-10poi_nameSubstation El Dorado - MoenkopiLGP POI In Service - Moenkopilow
2026-08-10phase+low
2026-08-03new_projectactivehigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27

Provenance: aps-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.