Arizona Public Service Queue Project Q624 — Battery in Maricopa Az, the U.S.
Arizona Public Service Queue Project Q624 — Battery in Maricopa Az, the U.S. is a 300.0 MW battery interconnection project with a current status of active. It is proposed to connect at (bus number -.
300.0 MWCapacity
ActiveStatus
—Market
BatteryTechnology
Project facts
| Canonical name | Arizona Public Service Queue Project Q624 — Battery in Maricopa Az, the U.S. |
|---|---|
| Queue ID | Q624 |
| Status | active |
| Source status | Study Phase 1 Interconnection Energy |
| Market | — |
| Technology | Battery |
| Capacity | 300.0 MW |
| State | — |
| County | Maricopa Az |
| Point of interconnection | (bus number - |
| Requested (queue) date | 2026-04-29 |
| Proposed in-service date | 2030-12-23 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | Arizona Public Service |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-10 | poi_name | Substation (bus number - 14237) | (bus number - | low |
| 2026-08-03 | new_project | — | active | high |
Explore related data
Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-28
Provenance: aps-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.