Arizona Public Service Queue Project Q635 — Battery in Navajo Az, the U.S.

Arizona Public Service Queue Project Q635 — Battery in Navajo Az, the U.S. is a 400.0 MW battery interconnection project with a current status of active. It is proposed to connect at 500kV Substation.

400.0 MWCapacity
ActiveStatus
Market
BatteryTechnology

Project facts

Canonical nameArizona Public Service Queue Project Q635 — Battery in Navajo Az, the U.S.
Queue IDQ635
Statusactive
Source status1 Cluster Study Interconnection Start of Network
Market
TechnologyBattery
Capacity400.0 MW
State
CountyNavajo Az
Point of interconnection500kV Substation
Requested (queue) date2026-05-05
Proposed in-service date2031-06-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerArizona Public Service

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-10poi_nameCholla 500kV Substation New 500kV POI on500kV Substationlow
2026-08-03new_projectactivehigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27

Provenance: aps-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.