Arizona Public Service Queue Project Q637 — Solar+Battery in Az, the U.S.

Arizona Public Service Queue Project Q637 — Solar+Battery in Az, the U.S. is a 750.0 MW solar+battery interconnection project with a current status of active. It is proposed to connect at 500kV.

750.0 MWCapacity
ActiveStatus
—Market
Solar+BatteryTechnology

Project facts

Canonical nameArizona Public Service Queue Project Q637 — Solar+Battery in Az, the U.S.
Queue IDQ637
Statusactive
Source statusPhase 1 Cluster Study Interconnection Service Energy
Market—
TechnologySolar+Battery
Capacity750.0 MW
State—
CountyAz
Point of interconnection500kV
Requested (queue) date2026-05-06
Proposed in-service date2031-05-31
Operational date—
Withdrawn date—
Developer—
Utility / transmission ownerArizona Public Service

What changed

ObservedFieldOld valueNew valueMateriality
2026-09-21poi_name500kV 500kV500kVlow
2026-09-21phase—Generationlow
2026-08-10poi_nameLine approximately 10- 15 miles outside of Cholla 500kV Substation Watermelon 500kV500kV 500kVlow
2026-08-03new_project—activehigh

Explore related data

Source last checked2026-10-12
Data last materially changed2026-10-12
Page data generated2026-10-12

Provenance: aps-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata