Arizona Public Service Queue Project Q641 — Battery in Pima Az, the U.S.

Arizona Public Service Queue Project Q641 — Battery in Pima Az, the U.S. is a 320.0 MW battery interconnection project with a current status of active. It is proposed to connect at LGP POI In Service.

320.0 MWCapacity
ActiveStatus
Market
BatteryTechnology

Project facts

Canonical nameArizona Public Service Queue Project Q641 — Battery in Pima Az, the U.S.
Queue IDQ641
Statusactive
Source status1 Cluster Study Interconnection Interconnection Status Type Start of Network
Market
TechnologyBattery
Capacity320.0 MW
State
CountyPima Az
Point of interconnectionLGP POI In Service
Requested (queue) date2026-05-07
Proposed in-service date2031-05-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerArizona Public Service

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-10poi_nameSubstation New 69kV switchyard cut into the White Tanks - Sarival 69kV line. Meter point into the newLGP POI In Servicelow
2026-08-03new_projectactivehigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-28

Provenance: aps-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata