Arizona Public Service Queue Project Q641 — Battery in Pima Az, the U.S.
Arizona Public Service Queue Project Q641 — Battery in Pima Az, the U.S. is a 320.0 MW battery interconnection project with a current status of active. It is proposed to connect at LGP POI In Service.
320.0 MWCapacity
ActiveStatus
—Market
BatteryTechnology
Project facts
| Canonical name | Arizona Public Service Queue Project Q641 — Battery in Pima Az, the U.S. |
|---|---|
| Queue ID | Q641 |
| Status | active |
| Source status | 1 Cluster Study Interconnection Interconnection Status Type Start of Network |
| Market | — |
| Technology | Battery |
| Capacity | 320.0 MW |
| State | — |
| County | Pima Az |
| Point of interconnection | LGP POI In Service |
| Requested (queue) date | 2026-05-07 |
| Proposed in-service date | 2031-05-01 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | Arizona Public Service |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-10 | poi_name | Substation New 69kV switchyard cut into the White Tanks - Sarival 69kV line. Meter point into the new | LGP POI In Service | low |
| 2026-08-03 | new_project | — | active | high |
Explore related data
Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-28
Provenance: aps-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata