Arizona Public Service Queue Project Q647 — Battery in Maricopa Az, the U.S.

Arizona Public Service Queue Project Q647 — Battery in Maricopa Az, the U.S. is a 300.0 MW battery interconnection project with a current status of active. It is proposed to connect at 230kV 500kV.

300.0 MWCapacity
ActiveStatus
Market
BatteryTechnology

Project facts

Canonical nameArizona Public Service Queue Project Q647 — Battery in Maricopa Az, the U.S.
Queue IDQ647
Statusactive
Source status1 Cluster Study Interconnection Start of Network
Market
TechnologyBattery
Capacity300.0 MW
State
CountyMaricopa Az
Point of interconnection230kV 500kV
Requested (queue) date2026-05-13
Proposed in-service date2031-06-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerArizona Public Service

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-10poi_nameHazen 230kV Sun Valley 500kV230kV 500kVlow
2026-08-03new_projectactivehigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-28

Provenance: aps-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata