Arizona Public Service Queue Project Q648 — Battery in Maricopa Az, the U.S.

Arizona Public Service Queue Project Q648 — Battery in Maricopa Az, the U.S. is a 500.0 MW battery interconnection project with a current status of active. It is proposed to connect at TS-25 230kV.

500.0 MWCapacity
ActiveStatus
Market
BatteryTechnology

Project facts

Canonical nameArizona Public Service Queue Project Q648 — Battery in Maricopa Az, the U.S.
Queue IDQ648
Statusactive
Source statusStudy Phase 1 Interconnection Network
Market
TechnologyBattery
Capacity500.0 MW
State
CountyMaricopa Az
Point of interconnectionTS-25 230kV
Requested (queue) date2026-05-13
Proposed in-service date2030-12-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerArizona Public Service

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-10poi_nameSubstation Future TS-25 230kVTS-25 230kVlow
2026-08-03new_projectactivehigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27

Provenance: aps-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata