Arizona Public Service Queue Project Q654 — Battery in Yuma Az, the U.S.
Arizona Public Service Queue Project Q654 — Battery in Yuma Az, the U.S. is a 450.0 MW battery interconnection project with a current status of active. It is proposed to connect at Hill 500kV.
450.0 MWCapacity
ActiveStatus
—Market
BatteryTechnology
Project facts
| Canonical name | Arizona Public Service Queue Project Q654 — Battery in Yuma Az, the U.S. |
|---|---|
| Queue ID | Q654 |
| Status | active |
| Source status | 1 Cluster Study Interconnection Energy |
| Market | — |
| Technology | Battery |
| Capacity | 450.0 MW |
| State | — |
| County | Yuma Az |
| Point of interconnection | Hill 500kV |
| Requested (queue) date | 2026-05-14 |
| Proposed in-service date | 2029-04-30 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | Arizona Public Service |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-10 | poi_name | Hoodoo Wash 500kV Requested POI | Hill 500kV | low |
| 2026-08-03 | new_project | — | active | high |
Explore related data
Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27
Provenance: aps-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata