Arizona Public Service Queue Project Q660 — Gas in Maricopa Az, the U.S.

Arizona Public Service Queue Project Q660 — Gas in Maricopa Az, the U.S. is a 207.6 MW gas interconnection project with a current status of active. It is proposed to connect at Substation 500 kV.

207.6 MWCapacity
ActiveStatus
Market
GasTechnology

Project facts

Canonical nameArizona Public Service Queue Project Q660 — Gas in Maricopa Az, the U.S.
Queue IDQ660
Statusactive
Source statusStudy Phase 1 Interconnection Network
Market
TechnologyGas
Capacity207.6 MW
State
CountyMaricopa Az
Point of interconnectionSubstation 500 kV
Requested (queue) date2026-05-15
Proposed in-service date2026-09-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerArizona Public Service

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-10poi_nameAPS Raptor Substation Saguaro 500 kVSubstation 500 kVlow
2026-08-03new_projectactivehigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27

Provenance: aps-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.