Arizona Public Service Queue Project Q674 — Solar+Battery in Az, the U.S.
Arizona Public Service Queue Project Q674 — Solar+Battery in Az, the U.S. is a 600.0 MW solar+battery interconnection project with a current status of operational. It is proposed to connect at 69 kV SS POI 230kV.
600.0 MWCapacity
OperationalStatus
—Market
Solar+BatteryTechnology
Project facts
| Canonical name | Arizona Public Service Queue Project Q674 — Solar+Battery in Az, the U.S. |
|---|---|
| Queue ID | Q674 |
| Status | operational |
| Source status | Phase 1 Cluster Study Interconnection Service Surplus Request: In Review Network Surplus Request: Resource Complete Interconnection Service Interconnection Current Status Request Energy Surplus Request: In Interconnection Review Service Network Surplus Request: In Resource Review Interconnection Service Network Resource |
| Market | — |
| Technology | Solar+Battery |
| Capacity | 600.0 MW |
| State | — |
| County | Az |
| Point of interconnection | 69 kV SS POI 230kV |
| Requested (queue) date | 2026-05-18 |
| Proposed in-service date | — |
| Operational date | 2029-10-10 |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | Arizona Public Service |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-09-21 | poi_name | 69 kV SS Wash 500kV | 69 kV SS POI 230kV | low |
| 2026-09-21 | phase | — | Generation | low |
| 2026-09-21 | operational_date | — | 2029-10-10 | medium |
| 2026-09-21 | proposed_online_date | 2029-10-10 | — | medium |
| 2026-09-21 | status | active | operational | high |
| 2026-08-10 | poi_name | Orchard | 69 kV SS Wash 500kV | low |
| 2026-08-03 | new_project | — | active | high |
Explore related data
Source last checked2026-10-12
Data last materially changed2026-10-12
Page data generated2026-10-12
Provenance: aps-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata