PSE Cherry Point (L0359)

PSE Cherry Point is a 1,176.2 MW other interconnection project in Whatcom, Washington with a current status of withdrawn. It is proposed to connect at Loop in of BPA Intalco-Custer #1 230 kV line.

1,176.2 MWCapacity
WithdrawnStatus
WAMarket
OtherTechnology

Project facts

Canonical namePSE Cherry Point
Queue IDL0359
Statuswithdrawn
Source statusWITHDRAWN
MarketWA
TechnologyOther
Capacity1,176.2 MW
StateWashington
CountyWhatcom
Point of interconnectionLoop in of BPA Intalco-Custer #1 230 kV line
Requested (queue) date2013-06-05
Proposed in-service date2017-03-01
Operational date
Withdrawn date
DeveloperPuget Sound Energy
Utility / transmission ownerBonneville Power Administration

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata