PSEG Fossil Bergen Unit 2 (0274)

PSEG Fossil Bergen Unit 2 is a 100.0 MW gas interconnection project in Ny-nj, New York with a current status of withdrawn. It is proposed to connect at W49th Street 345kV.

100.0 MWCapacity
WithdrawnStatus
JMarket
GasTechnology

Project facts

Canonical namePSEG Fossil Bergen Unit 2
Queue ID0274
Statuswithdrawn
Source status0
MarketJ
TechnologyGas
Capacity100.0 MW
StateNew York
CountyNy-nj
Point of interconnectionW49th Street 345kV
Requested (queue) date2008-01-23
Proposed in-service date2008-07-10
Operational date
Withdrawn date
DeveloperIn City I, LLC
Utility / transmission ownerCONED

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.