PSEG Long Island Storage PAM-2019-64923 is a 2.0 MW battery interconnection project in Suffolk, New York with a current status of operational. It is proposed to connect at 340 / 4551.

2.0 MWCapacity
OperationalStatus
PatchogueMarket
BatteryTechnology

Project facts

Canonical namePSEG Long Island Storage PAM-2019-64923
Queue IDPAM-2019-64923
Statusoperational
Source statusInterconnected
MarketPatchogue
TechnologyBattery
Capacity2.0 MW
StateNew York
CountySuffolk
Point of interconnection340 / 4551
Requested (queue) date
Proposed in-service date
Operational date2025-07-23
Withdrawn date
DeveloperAgilitas Energy, Inc.
Utility / transmission ownerPSEG Long Island

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-05new_projectoperationalhigh

Explore related data

Source last checked2026-08-05
Data last materially changed2026-08-05
Page data generated2026-08-28

Provenance: ny-storage. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata