Purple Lake (6302_3)

Purple Lake is a 1.3 MW other interconnection project in Prince Of Wales Ketchikan, Alaska with a current status of operational.

1.3 MWCapacity
OperationalStatus
—Market
OtherTechnology

Project facts

Canonical namePurple Lake
Queue ID6302_3
Statusoperational
Source status(OP) Operating
Market—
TechnologyOther
Capacity1.3 MW
StateAlaska
CountyPrince Of Wales Ketchikan
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date1962-12-01
Withdrawn date—
Developer—
Utility / transmission ownerMetlakatla Power & Light

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_project—operationalhigh

Explore related data

Source last checked2026-10-02
Data last materially changed2026-10-02
Page data generated2026-10-12

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata