PW1 & PW2 (L0610)

PW1 & PW2 is a 250.0 MW other interconnection project in Columbia, Washington with a current status of active. It is proposed to connect at Allston Substation.

250.0 MWCapacity
ActiveStatus
WAMarket
OtherTechnology

Project facts

Canonical namePW1 & PW2
Queue IDL0610
Statusactive
Source statusSTUDY
MarketWA
TechnologyOther
Capacity250.0 MW
StateWashington
CountyColumbia
Point of interconnectionAllston Substation
Requested (queue) date2024-05-20
Proposed in-service date2027-05-20
Operational date
Withdrawn date
DeveloperClatskanie People's Utility District
Utility / transmission ownerBonneville Power Administration

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectactivehigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata