Queen City (0890)

Queen City is a 19.2 MW battery interconnection project in Dutchess, New York with a current status of withdrawn. It is proposed to connect at Knapps Corners.

19.2 MWCapacity
WithdrawnStatus
KMarket
BatteryTechnology

Project facts

Canonical nameQueen City
Queue ID0890
Statuswithdrawn
Source status0
MarketK
TechnologyBattery
Capacity19.2 MW
StateNew York
CountyDutchess
Point of interconnectionKnapps Corners
Requested (queue) date2019-06-20
Proposed in-service date2019-10-04
Operational date
Withdrawn date
DeveloperEnergy Efficiency Solar, Inc. dba ACRO Energy Inc.
Utility / transmission ownerCHGE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.