Quindaro 161kV Substation (ERAS-2025-031)

Quindaro 161kV Substation is a 150.0 MW gas interconnection project in Kansas City, Kansas with a current status of operational. It is proposed to connect at Quindaro 161kV Substation.

150.0 MWCapacity
OperationalStatus
KSMarket
GasTechnology

Project facts

Canonical nameQuindaro 161kV Substation
Queue IDERAS-2025-031
Statusoperational
Source statusERAS
MarketKS
TechnologyGas
Capacity150.0 MW
StateKansas
CountyKansas City
Point of interconnectionQuindaro 161kV Substation
Requested (queue) date2025-10-02
Proposed in-service date
Operational date2028-02-29
Withdrawn date
Developer
Utility / transmission ownerKACY

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.