Quinn-Blackhawk 345kV (J1865)

Quinn-Blackhawk 345kV is a 250.0 MW wind interconnection project in Hardin, Iowa with a current status of withdrawn. It is proposed to connect at Quinn-Blackhawk 345kV.

250.0 MWCapacity
WithdrawnStatus
Market
WindTechnology

Project facts

Canonical nameQuinn-Blackhawk 345kV
Queue IDJ1865
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyWind
Capacity250.0 MW
StateIowa
CountyHardin
Point of interconnectionQuinn-Blackhawk 345kV
Requested (queue) date2021-08-16
Proposed in-service date2024-09-15
Operational date2024-09-15
Withdrawn date2021-09-17
Developer
Utility / transmission ownerITC MIDWEST

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.