Raisin - METC Tap 138kV Line Tap is a 80.0 MW solar interconnection project in Lenawee County, Michigan with a current status of withdrawn. It is proposed to connect at Raisin - METC Tap 138kV Line Tap.

80.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameRaisin - METC Tap 138kV Line Tap
Queue IDJ1173
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity80.0 MW
StateMichigan
CountyLenawee County
Point of interconnectionRaisin - METC Tap 138kV Line Tap
Requested (queue) date2018-03-12
Proposed in-service date2019-12-01
Operational date2019-12-01
Withdrawn date2020-06-30
Developer
Utility / transmission ownerConsumers Energy Co - (MI)

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.