Raquette Lake Energy Storage / CAMP (1395)

Raquette Lake Energy Storage / CAMP is a 20.0 MW battery interconnection project in Hamilton, New York with a current status of withdrawn. It is proposed to connect at Raquette Lake - Eagle Bay 46 kV line.

20.0 MWCapacity
WithdrawnStatus
EMarket
BatteryTechnology

Project facts

Canonical nameRaquette Lake Energy Storage / CAMP
Queue ID1395
Statuswithdrawn
Source status0
MarketE
TechnologyBattery
Capacity20.0 MW
StateNew York
CountyHamilton
Point of interconnectionRaquette Lake - Eagle Bay 46 kV line
Requested (queue) date2022-06-23
Proposed in-service date2024-02-29
Operational date
Withdrawn date
DeveloperExcelsior Reserve Energy
Utility / transmission ownerNM-NG

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata