Ratcliffe (57037_1B)

Ratcliffe is a 235.5 MW gas interconnection project in Kemper, Mississippi with a current status of operational.

235.5 MWCapacity
OperationalStatus
SOCOMarket
GasTechnology

Project facts

Canonical nameRatcliffe
Queue ID57037_1B
Statusoperational
Source status(OP) Operating
MarketSOCO
TechnologyGas
Capacity235.5 MW
StateMississippi
CountyKemper
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date2014-08-01
Withdrawn date
Developer
Utility / transmission ownerMississippi Power Co

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata