REC Bradford - W. Darien 138kV Line (S1006)

REC Bradford - W. Darien 138kV Line is a 75.0 MW generation interconnection project with a current status of operational. It is proposed to connect at REC Bradford - W. Darien 138kV Line.

75.0 MWCapacity
OperationalStatus
Market
GenerationTechnology

Project facts

Canonical nameREC Bradford - W. Darien 138kV Line
Queue IDS1006
Statusoperational
Source statusWithdrawn
Market
TechnologyGeneration
Capacity75.0 MW
StateWisconsin
County
Point of interconnectionREC Bradford - W. Darien 138kV Line
Requested (queue) date2021-04-02
Proposed in-service date2023-10-30
Operational date2023-10-30
Withdrawn date
Developer
Utility / transmission ownerAMERICAN TRANSMISSION COMPANY

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.