RED GUM - WINNSBORO 115 kV (122.5,122.6,122.7) (J3098)

RED GUM - WINNSBORO 115 kV (122.5,122.6,122.7) is a 75.0 MW solar interconnection project in Franklin, Louisiana with a current status of withdrawn. It is proposed to connect at RED GUM - WINNSBORO 115 kV (122.5,122.6,122.7).

75.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameRED GUM - WINNSBORO 115 kV (122.5,122.6,122.7)
Queue IDJ3098
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity75.0 MW
StateLouisiana
CountyFranklin
Point of interconnectionRED GUM - WINNSBORO 115 kV (122.5,122.6,122.7)
Requested (queue) date2022-09-14
Proposed in-service date2027-04-15
Operational date2027-04-15
Withdrawn date2025-07-30
Developer
Utility / transmission ownerENTERGY ARKANSAS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.