Red Horse 2 (58833_RH2S)

Red Horse 2 is a 51.0 MW solar interconnection project in Cochise, Arizona with a current status of operational.

51.0 MWCapacity
OperationalStatus
TEPCMarket
SolarTechnology

Project facts

Canonical nameRed Horse 2
Queue ID58833_RH2S
Statusoperational
Source status(OP) Operating
MarketTEPC
TechnologySolar
Capacity51.0 MW
StateArizona
CountyCochise
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date2015-08-01
Withdrawn date—
Developer—
Utility / transmission ownerRed Horse 2

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_project—operationalhigh

Explore related data

Source last checked2026-10-02
Data last materially changed2026-10-02
Page data generated2026-10-11

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata