Red Oak Ridge Energy Center (E0012)

Red Oak Ridge Energy Center is a 1,211.2 MW gas interconnection project in Kenosha, Wisconsin with a current status of active. It is proposed to connect at Paris-Lakeview 345kV double circuit.

1,211.2 MWCapacity
ActiveStatus
MISOMarket
GasTechnology

Project facts

Canonical nameRed Oak Ridge Energy Center
Queue IDE0012
Statusactive
Source statusactive
MarketMISO
TechnologyGas
Capacity1,211.2 MW
StateWisconsin
CountyKenosha
Point of interconnectionParis-Lakeview 345kV double circuit
Requested (queue) date2025-08-06
Proposed in-service date2027-12-01
Operational date
Withdrawn date
DeveloperInvenergy
Utility / transmission ownerWisconsin Electric Power Co

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata