Red Wing to Herbert 69kV (Redwing - Bay City - Esdaile - Herbert) (J1569)

Red Wing to Herbert 69kV (Redwing - Bay City - Esdaile - Herbert) is a 44.0 MW solar interconnection project in Pierce, Wisconsin with a current status of withdrawn. It is proposed to connect at Red Wing to Herbert 69kV (Redwing - Bay City - Esdaile - Herbert).

44.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameRed Wing to Herbert 69kV (Redwing - Bay City - Esdaile - Herbert)
Queue IDJ1569
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity44.0 MW
StateWisconsin
CountyPierce
Point of interconnectionRed Wing to Herbert 69kV (Redwing - Bay City - Esdaile - Herbert)
Requested (queue) date2020-06-22
Proposed in-service date2023-08-31
Operational date2023-08-31
Withdrawn date2021-01-05
Developer
Utility / transmission ownerNORTHERN STATES POWER COMPANY

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata