Redbud 345kV Substation (ERAS-2025-003)

Redbud 345kV Substation is a 186.0 MW gas interconnection project in Luther, Oklahoma with a current status of operational. It is proposed to connect at Redbud 345kV Substation.

186.0 MWCapacity
OperationalStatus
OKMarket
GasTechnology

Project facts

Canonical nameRedbud 345kV Substation
Queue IDERAS-2025-003
Statusoperational
Source statusERAS
MarketOK
TechnologyGas
Capacity186.0 MW
StateOklahoma
CountyLuther
Point of interconnectionRedbud 345kV Substation
Requested (queue) date2025-09-10
Proposed in-service date
Operational date2025-10-24
Withdrawn date
Developer
Utility / transmission ownerOGE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata