Redstone 138 kV Substation (J749)

Redstone 138 kV Substation is a 20.0 MW battery interconnection project in Gratiot County, Michigan with a current status of withdrawn. It is proposed to connect at Redstone 138 kV Substation.

20.0 MWCapacity
WithdrawnStatus
Market
BatteryTechnology

Project facts

Canonical nameRedstone 138 kV Substation
Queue IDJ749
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyBattery
Capacity20.0 MW
StateMichigan
CountyGratiot County
Point of interconnectionRedstone 138 kV Substation
Requested (queue) date2016-11-14
Proposed in-service date2018-09-01
Operational date2018-09-01
Withdrawn date2018-05-01
Developer
Utility / transmission ownerMETC

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata