REDSTONE - TITTABAWASSEE 138.0kV (J3643)

REDSTONE - TITTABAWASSEE 138.0kV is a 50.0 MW battery interconnection project in Midland, Michigan with a current status of withdrawn. It is proposed to connect at REDSTONE - TITTABAWASSEE 138.0kV.

50.0 MWCapacity
WithdrawnStatus
Market
BatteryTechnology

Project facts

Canonical nameREDSTONE - TITTABAWASSEE 138.0kV
Queue IDJ3643
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyBattery
Capacity50.0 MW
StateMichigan
CountyMidland
Point of interconnectionREDSTONE - TITTABAWASSEE 138.0kV
Requested (queue) date2024-04-18
Proposed in-service date2028-10-16
Operational date2028-10-16
Withdrawn date2024-11-04
Developer
Utility / transmission ownerMETC

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata