Reed-Reed Tap #2 69 kV (AF2-444)

Reed-Reed Tap #2 69 kV is a 19.8 MW solar interconnection project in Northumberland, Pennsylvania with a current status of withdrawn.

19.8 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameReed-Reed Tap #2 69 kV
Queue IDAF2-444
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity19.8 MW
StatePennsylvania
CountyNorthumberland
Point of interconnection
Requested (queue) date2020-03-31
Proposed in-service date2021-06-01
Operational date
Withdrawn date2024-12-18
Developer
Utility / transmission ownerPPL

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata