Refinery Substation Load Addition (L0597)

Refinery Substation Load Addition is a 15.0 MW other interconnection project in Whatcom, Washington with a current status of operational. It is proposed to connect at Bellingham Substation.

15.0 MWCapacity
OperationalStatus
WAMarket
OtherTechnology

Project facts

Canonical nameRefinery Substation Load Addition
Queue IDL0597
Statusoperational
Source statusBPA COMPLETED
MarketWA
TechnologyOther
Capacity15.0 MW
StateWashington
CountyWhatcom
Point of interconnectionBellingham Substation
Requested (queue) date2024-03-21
Proposed in-service date
Operational date2027-03-21
Withdrawn date
DeveloperPublic Utility District No. 1 of Cowlitz County
Utility / transmission ownerBonneville Power Administration

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectoperationalhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata