REN 115 kV Substation (GEN-2023-062)

REN 115 kV Substation is a 98.0 MW other interconnection project in Williams, North Dakota with a current status of withdrawn. It is proposed to connect at REN 115 kV Substation.

98.0 MWCapacity
WithdrawnStatus
NDMarket
OtherTechnology

Project facts

Canonical nameREN 115 kV Substation
Queue IDGEN-2023-062
Statuswithdrawn
Source statusWITHDRAWN
MarketND
TechnologyOther
Capacity98.0 MW
StateNorth Dakota
CountyWilliams
Point of interconnectionREN 115 kV Substation
Requested (queue) date2023-10-02
Proposed in-service date2028-07-31
Operational date
Withdrawn date2025-08-25
Developer
Utility / transmission ownerLYREC

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata