Revolution Offshore Wind CNR only (1265)
Revolution Offshore Wind CNR only is a 750.8 MW wind interconnection project with a current status of active. It is proposed to connect at NG 115 kV Davisville Substation, Washington County.
750.8 MWCapacity
ActiveStatus
RIMarket
WindTechnology
Project facts
| Canonical name | Revolution Offshore Wind CNR only |
|---|---|
| Queue ID | 1265 |
| Status | active |
| Source status | A |
| Market | RI |
| Technology | Wind |
| Capacity | 750.8 MW |
| State | Rhode Island |
| County | — |
| Point of interconnection | NG 115 kV Davisville Substation, Washington County |
| Requested (queue) date | 2022-05-23 |
| Proposed in-service date | 2026-11-05 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | ISO-NE |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | active | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27
Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata