RG&E DG 21416 (21416)

RG&E DG 21416 is a 3.0 MW solar interconnection project in Monroe, New York with a current status of operational. It is proposed to connect at 0106RO5166-251 Mendon Center RD / 0106RO5166.

3.0 MWCapacity
OperationalStatus
HenriettaMarket
SolarTechnology

Project facts

Canonical nameRG&E DG 21416
Queue ID21416
Statusoperational
Source statusInterconnected
MarketHenrietta
TechnologySolar
Capacity3.0 MW
StateNew York
CountyMonroe
Point of interconnection0106RO5166-251 Mendon Center RD / 0106RO5166
Requested (queue) date
Proposed in-service date
Operational date2025-12-22
Withdrawn date
Developer
Utility / transmission ownerRG&E

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-05new_projectoperationalhigh

Explore related data

Source last checked2026-08-05
Data last materially changed2026-08-05
Page data generated2026-08-27

Provenance: ny-dg-solar. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata