RG&E Storage 14515 (14515)

RG&E Storage 14515 is a 4.0 MW battery interconnection project in Monroe, New York with a current status of operational. It is proposed to connect at 0070RO5236-1694 Manitou RD / 0070RO5236.

4.0 MWCapacity
OperationalStatus
SpencerportMarket
BatteryTechnology

Project facts

Canonical nameRG&E Storage 14515
Queue ID14515
Statusoperational
Source statusInterconnected
MarketSpencerport
TechnologyBattery
Capacity4.0 MW
StateNew York
CountyMonroe
Point of interconnection0070RO5236-1694 Manitou RD / 0070RO5236
Requested (queue) date
Proposed in-service date
Operational date2022-03-28
Withdrawn date
Developer
Utility / transmission ownerRG&E

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-05new_projectoperationalhigh

Explore related data

Source last checked2026-08-05
Data last materially changed2026-08-05
Page data generated2026-08-27

Provenance: ny-storage. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata