Rhame 230 kV Sub (GEN-2017-010)

Rhame 230 kV Sub is a 200.1 MW wind interconnection project in Bowman County, North Dakota with a current status of operational. It is proposed to connect at Rhame 230 kV Sub.

200.1 MWCapacity
OperationalStatus
NDMarket
WindTechnology

Project facts

Canonical nameRhame 230 kV Sub
Queue IDGEN-2017-010
Statusoperational
Source statusIA FULLY EXECUTED/COMMERCIAL OPERATION
MarketND
TechnologyWind
Capacity200.1 MW
StateNorth Dakota
CountyBowman County
Point of interconnectionRhame 230 kV Sub
Requested (queue) date2017-04-14
Proposed in-service date
Operational date2022-10-31
Withdrawn date
Developer
Utility / transmission ownerBEPC

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata