Richard 138kV is a 75.0 MW battery interconnection project in Acadia, Louisiana with a current status of withdrawn. It is proposed to connect at Richard 138kV.

75.0 MWCapacity
WithdrawnStatus
Market
BatteryTechnology

Project facts

Canonical nameRichard 138kV
Queue IDJ2415
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyBattery
Capacity75.0 MW
StateLouisiana
CountyAcadia
Point of interconnectionRichard 138kV
Requested (queue) date2022-09-13
Proposed in-service date2026-10-01
Operational date2026-10-01
Withdrawn date2025-07-30
Developer
Utility / transmission ownerENTERGY ARKANSAS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.